“At Liverpool John Moore’s University we commissioned two environmental chambers from a UK based company to provide high specification dual altitude and high temperature chambers of large size. We were dismayed to find that after many problems running these chambers in the first year they were not fit for purpose. The significant challenge of providing simultaneous altitude and high environmental temperature proved way beyond the capacity and expertise of this company to deliver.
However, the TISS team were able to provide a solution to the multiple problems left behind by their competitors and have very successfully re-engineered these facilities. I can now say with complete confidence that after significant testing (both by TISS and ourselves), these chambers are now functioning at designated capacity and we are very pleased with them.
Therefore I can thoroughly recommend Frank and his team as having the requisite engineering knowledge and skill to deliver these custom and important laboratories. My best recommendation would be that they are highly professional and leave no stone unturned to satisfy the customer.”